Client: Sydney Metro 2
Scope: Over the duration of approx. 1 year EMC Civil was involved in the set up of the new Barangaroo station in the preparation for the tunnelling teams and permanent station construction. Within this project various temporary concrete structures both insitu and precast were constructed and installed on site including concrete transport roads, barge loading dock, capping beams, retaining walls and a temporary road bridge. EMC also aided the archaeological teams on the 180 year old boat excavation and preservation works to ensure it was removed without damage to let the project proceed.